🇮🇳 Gujarat · GERC © FY 2026-27

Electricity Bill Calculator — Gujarat (MGVCL · PGVCL · UGVCL · DGVCL · Torrent)

Enter your units — get an instant itemised bill estimate for this state.

Estimate your Gujarat bill

units

Bill breakdown

Estimated bill this month
—
Units
—
Avg rate
—
Fixed charge
—
Subsidy
—
Verified against GERC order FY 2026-27. Gujarat's fuel & power adjustment can run negative in surplus months — the FAC line shows it.

Gujarat residential slabs & charges (2026-27)

DISCOMSlab rates (₹/unit)FixedFACScheme

Gujarat bill — quick answers

Why are Gujarat electricity bills so cheap?

Efficient, well-run DISCOMs and a stable tariff: ₹3.05–₹5.20/unit with a ₹25 fixed charge — among the lowest domestic tariffs nationwide.

Am I on a state DISCOM or Torrent?

Torrent serves Ahmedabad & Gandhinagar and Surat city. The rest of Gujarat is one of MGVCL, PGVCL, UGVCL or DGVCL — check your bill logo.

Keep exploring

Gujarat electricity bill calculator — how your bijli bill is built

Gujarat's GUVNL utilities — MGVCL (central), PGVCL (Saurashtra), UGVCL (north) and DGVCL (south) — combined with Torrent Power in Ahmedabad–Gandhinagar–Surat bill on RGP slabs of ₹3.05 (0–50), ₹3.50 (51–100), ₹4.15 (101–250) and ₹5.20 (251+) per unit with a load-band fixed charge (₹15/25/45/70), 15% urban electricity duty and an FPPA around ₹2.70/unit. Torrent areas run their own ladder — ₹3.20/₹3.95/₹5.00 in Ahmedabad, ₹3.20/₹3.65/₹4.25/₹5.05 in Surat.

No free-unit scheme and a modest fixed fee keep the Gujarati bill clean; the main choices are GUVNL versus Torrent and urban versus rural duty (7.5% rural). Our board chips let you compare all of them in one click.

Example: your Gujarat bill for 250 units

Take a Gujarat household using 250 units in one month on MGVCL (Central). The telescopic energy charge is 50 × ₹3.05 + 50 × ₹3.5 + 150 × ₹4.15 = ₹950.00. Add the fixed charge (₹25.00), FAC (₹675.00) and electricity duty (₹247.50) — that gives a gross bill of ₹1897.50. With no subsidy in this state, ₹1897.50 is your payable.

Here is the same 250 units across every DISCOM in Gujarat — useful when your board's name differs from the common one:

DISCOMEnergyFixedFACDutySubsidyTotal
MGVCL (Central)₹950.00₹25.00₹675.00₹247.50—₹1897.50
PGVCL (Saurashtra)₹950.00₹25.00₹675.00₹247.50—₹1897.50
UGVCL (North)₹950.00₹25.00₹675.00₹247.50—₹1897.50
DGVCL (South)₹950.00₹25.00₹675.00₹247.50—₹1897.50
Torrent Power (Ahmedabad)₹1002.50₹25.00₹75.00₹165.38—₹1267.88
Torrent Power (Surat)₹980.00₹25.00₹75.00₹162.00—₹1242.00

Does Gujarat offer a free-unit scheme?

Gujarat currently bills without a domestic free-unit subsidy, so the calculator's checkbox stays off and no green deduction line appears. That is tariff design, not an error — the energy charge is collected in full and the fixed charge, FAC and duty apply on top. If the state announces a scheme, we add it to the data and the toggle lights up automatically.

Gujarat tariff details — live data

The table below is generated from the same data the calculator uses, so what you see here is exactly what is charged. Looking for the per-unit electricity price in The slab column IS your per-unit rate — each rate applies only to the units inside its own slab range.

DISCOMSlabsFixed chargeFAC
MGVCL (Central)1–50 @ ₹3.05, 51–100 @ ₹3.5, 101–250 @ ₹4.15, 251–above 251 @ ₹5.2₹25/month₹2.7/unit
PGVCL (Saurashtra)1–50 @ ₹3.05, 51–100 @ ₹3.5, 101–250 @ ₹4.15, 251–above 251 @ ₹5.2₹25/month₹2.7/unit
UGVCL (North)1–50 @ ₹3.05, 51–100 @ ₹3.5, 101–250 @ ₹4.15, 251–above 251 @ ₹5.2₹25/month₹2.7/unit
DGVCL (South)1–50 @ ₹3.05, 51–100 @ ₹3.5, 101–250 @ ₹4.15, 251–above 251 @ ₹5.2₹25/month₹2.7/unit
Torrent Power (Ahmedabad)1–50 @ ₹3.2, 51–200 @ ₹3.95, 201–above 201 @ ₹5₹25/month₹0.3/unit
Torrent Power (Surat)1–50 @ ₹3.2, 51–100 @ ₹3.65, 101–250 @ ₹4.25, 251–above 251 @ ₹5.05₹25/month₹0.3/unit

Remember: in telescopic billing each slab rate applies only to the units inside its range. Many websites multiply one rate by total units — that is wrong and overstates bills. This calculator, like your DISCOM, adds slab by slab.

4 practical ways to lower your Gujarat bill

  1. Compare GUVNL vs Torrent for your street — in a metro the private licensee may be cheaper at low units.
  2. Solar is so strong in Gujarat that a 3–4 kW plant often clears the bill — our solar tool sizes it.
  3. Cool the house before 6 pm to hold the ₹4.15 band up to 250 units.
  4. The ₹15 fixed fee is tiny — focus your effort on the energy slabs, not the standing charge.

Quick questions about Gujarat bills

Which Gujarat board serves my city?

MGVCL: the central belt; PGVCL: Saurashtra (Rajkot, Jamnagar); UGVCL: north (Patan, Banaskantha); DGVCL: Surat district; Torrent: Ahmedabad, Gandhinagar and Surat cities.

Do I have a free-unit scheme in Gujarat?

No — Gujarat domestic connections get no free-unit credit, so the subsidy toggle correctly reports nothing active.

What is the fixed charge?

Load-band based: ₹15 up to 2 kW, ₹25 for 2–4 kW, ₹45 for 4–6 kW, ₹70 above 6 kW (Torrent: ₹25 single-phase / ₹65 three-phase). The calculator uses the ₹25 band.

How does electricity duty work?

15% of the energy + FPPA base in urban areas (7.5% rural), charged under the Gujarat Electricity Duty Act — it is on top of the GERC energy rates.

Why might Torrent differ from the boards?

Torrent has its own GERC-approved schedule — 3.20/3.95/5.00 in Ahmedabad and 3.20/3.65/4.25/5.05 in Surat — so pick the right chip for an accurate estimate.

Explore Gujarat and beyond

Try the related tools: appliance cost, AC bill, solar savings and EV charging calculators, then cross-check your official bill line by line.